Contractor deposit and draw schedule generator.
Split one agreed contract total into a deposit and progress payments. Each line gets a milestone name, a trigger you can point to on site, a percent of the contract, the dollar amount, and the balance left after that draw. Presets cover common splits; you can edit every row before you print.
Everything runs in your browser. Nothing you type is uploaded to us, nothing is saved on our servers, and there are no trackers. Save a PDF from the print dialog before you close the tab if you need a copy later.
Project and payment plan
The default $15,000 total is sample data only. Replace it with your signed contract amount. Changing the preset replaces milestone rows; edit names and triggers to match your job.
Milestones
Trigger wording should describe something both sides can verify, like "after rough-in inspection" or "at substantial completion walk-through." Amounts update when you change the contract total or percents.
In the print window choose "Save as PDF" as the destination. Signature and date lines print blank for hand signatures on site.
Preview of what prints
Straight answers.
What is a contractor draw schedule?
It is the payment plan for a job that lasts more than a day. Instead of one lump sum up front, the contract total is split into a deposit and later draws, each tied to a milestone or stage of work both sides can name.
How much should the first deposit be?
That depends on your trade, materials cost, and local practice. Many residential jobs use something like 30–50% at signing, but your contract, lien rules, and what you need to buy before start day matter more than a generic rule. This tool does not tell you what is legal where you work.
Should milestone percentages add to 100%?
Yes. If the total percent is above or below 100%, the dollar amounts will not match the contract total. Fix the split before anyone signs, and keep the printed schedule with the contract or change orders.
What should each trigger condition say?
Write something observable: "upon material delivery," "after rough-in passed inspection," or "after punch-list completion." Vague triggers like "mid-job" are harder to enforce if payment stalls.
Is my project information uploaded anywhere?
No. The page runs in your browser only. We do not receive names, addresses, or amounts. It is a practical schedule builder, not legal, accounting, or tax advice. Confirm deposit limits and lien rules with qualified professionals where you work.
Set the schedule, then keep the rest of the paperwork straight.
- Contractor change order generator and estimate to invoice tool
When scope shifts after work starts, document the change and revised total before you invoice against the next draw.
- Free estimate template and job sheet template
Free CSV and printable HTML files for teams that still quote or track field work on paper or in spreadsheets.
- How to set a contractor draw schedule
Plain-language steps and sample milestone wording. Same idea as this tool, without the calculator.
- The $19 contractor kits
Estimate and invoice calculator, inspection report, proposal, job sheet, and warranty templates bundled into one practical download.
- Want customers to request estimates on your own website? See our $497 site
We build it first and you pay only if you want to keep it.