Roofing change order generator. Revised contract total done for you.
Use this free roofing change order form when hidden decking damage, extra flashing, or another tear-off layer changes scope and price after work has started. Enter the original contract, prior approved changes, and this change. The revised total updates as you type, then you print or save as PDF with signature blocks.
Everything stays in your browser. Nothing is uploaded to us, nothing is saved on our servers, and there are no trackers. Print or save a PDF before you close the tab.
Change order details
For prior change orders, use a negative total if earlier signed changes reduced the contract on balance.
This change: line items
Pre-filled items and the 95.00 plywood rate are sample placeholders: replace them with your own. Enter decking, flashing, dump fees, or credits as line amounts (negative for deductions).
Use 0 for no schedule change. A negative number means the job may finish sooner.
In the print window choose "Save as PDF" as the destination. Signature and date lines print blank for hand signatures on site.
Preview of what prints
Straight answers.
What is a roofing change order?
It is the signed add-on to your original roofing contract when scope changes after tear-off, like bad decking or extra flashing. It records what changed, the price, and the new contract total.
When should roofers issue one?
Before the extra work starts. When you find hidden damage, document the new scope, amount, and schedule impact, then get homeowner approval in writing.
How is the revised contract amount calculated?
Original contract amount plus prior approved change orders plus this change. The form does that sum live as you type, so the homeowner sees the full running total.
Can I include credits or removed work?
Yes. Enter a negative amount on a line item for deductions, such as removing ridge vent scope or crediting unused materials.
Is my project information uploaded anywhere?
No. The page runs in your browser only. We do not receive your numbers or addresses. Because nothing is stored on our side either, save a PDF if you need a copy after you close the tab.
Paperwork you can brand once and reuse.
- Free roofing estimate template and roof inspection checklist
The closest free templates we have today. There is no separate roofing change order file yet. Available as blank CSV and printable HTML sheets.
- The $19 contractor kits
Estimate and invoice calculator, inspection report, proposal, job sheet, and warranty templates bundled in one download.
- Want customers to request estimates on your own website? See our $497 site
We build it first and you pay only if you like it.